Optimal transmission voltage for very long HVAC cables

Til Kristian Vrana, Research Scientist at Sintef Energi

Til Kristian Vrana, Research Scientist at Sintef Energi
Ervin Bossanyi, Senior Principal Researcher in Renewables at DNV and visiting professor at Bristol University
Once the yaw ring is installed, the nacelle main frame must be turned over in order to complete the yaw system assembly. Temporary legs are installed, and fixtures are added to the yaw ring. The main frame is lifted, and one side is let down while the frame is rotated. Here you can see the…
Ervin Bossanyi, Senior Principal Researcher in Renewables at DNV and visiting professor at Bristol University