Similar Posts
Wind Farm Control using Scaled Models in a Boundary Layer Wind Tunnel
PROF. CARLO LUIGI BOTTASSO, Chair of Wind Energy, Founding Institute Director, Wind Energy Institute, Technical University of Munich
Wind Turbine Yaw drive and Brake Assembly
Once the yaw ring is installed, the nacelle main frame must be turned over in order to complete the yaw system assembly. Temporary legs are installed, and fixtures are added to the yaw ring. The main frame is lifted, and one side is let down while the frame is rotated. Here you can see the…
The Active Participation of wind power in operating reserves
Kristof De Vos, Market Development at Elia