Optimal Coordinated Control of Energy Extraction in Wind Farms

Johan Meyers, Professor at KU Leuven

Johan Meyers, Professor at KU Leuven
Once the yaw ring is installed, the nacelle main frame must be turned over in order to complete the yaw system assembly. Temporary legs are installed, and fixtures are added to the yaw ring. The main frame is lifted, and one side is let down while the frame is rotated. Here you can see the…