Similar Posts
Peel Ply in Wind Turbine blade Manufacturing
Peel-ply fabrics are indispensable materials in the manufacturing process of wind turbine blades. Peel ply is the name of the synthetic fabric that is placed on the surface of the composite of fibers and resin, in the vacuum infusion process or vacuum bag. Peel ply fabrics are generally made of polyamide (nylon) or polyester, in…
Offshore Wind Noise Reduction
Session 1 Slides Summary of Existing Foundations, Installation Methods, and Effects Ralph Grismala, P.E, Civil and Environmental Engineer, ICF Alternative Foundations and Installation Methods Session 2 Slides Noise Monitoring and Received Level Target Overview Samuel denes, Bureau of Ocean Energy Management Noise Abatement/ Mitigation Systems for impact pile- driving Technical overview and offshore experiences
Wind Turbine Gearbox Force and Stress Analyses
Three different types of forces act on gears and bearings in a gearbox. They are gravitational forces, frictional forces, and contact forces. The most significant are contact forces, due to the magnitude of the contact stresses that these forces are generating on the surfaces of the moving parts during operation. Contact force occurs when the…

An Overview of Some Historic Wind Turbines: Part 1
After the invention of electricity, in the late 19th century inventors turned their attention to generating electricity from the wind. Although windmills were there for a long period, they were mostly used for non-electric purposes. In this post, we will review the historic development of wind turbines from the 19th century to the 1960s. Blyth’s…
Wind Turbine Yaw drive and Brake Assembly
Once the yaw ring is installed, the nacelle main frame must be turned over in order to complete the yaw system assembly. Temporary legs are installed, and fixtures are added to the yaw ring. The main frame is lifted, and one side is let down while the frame is rotated. Here you can see the…
